← Back to Home

AssetStage Blog

CMMS implementation, data quality, and engineering standards

🔧 Data Quality
02
Jun 11, 20267 min read

Brick Schema Explained: How to Model and Stage Building Data

A practical guide to the Brick Schema ontology — how Brick models buildings, how it compares to Haystack, and how to stage messy source data into a clean, validated Brick model.

📋 Standards
03
Jun 10, 20265 min read

BACnet to Brick: Turning a Raw Point Scrape into a Clean Model

A step-by-step walkthrough of converting a messy BACnet point list into a validated Brick Schema model — classification, the two relationship graphs, SHACL validation, and export.

🔧 Data Quality
04
Jun 9, 20264 min read

Brick Schema vs Project Haystack: Which for Your Building Data?

A practical comparison of Brick Schema and Project Haystack — tagging vs ontology, reasoning power, the RealEstateCore merger, and why you don't have to choose blindly.

🔧 Data Quality
05
Jun 8, 20264 min read

Building Digital Twins: Why the Data Model Is the Hard Part

Digital-twin platforms are easy to buy and hard to feed. Why the underlying building data model — not the visualisation — decides whether a twin actually works.

⚙️ Software
06
Apr 29, 202614 min read

Asset Hierarchy in Maximo: Locations, Assets, and Classification Done Right

Maximo locations, assets, and classification explained for implementation teams. How to structure the object model correctly before you load a single record.

📊 CMMS
07
Apr 9, 20266 min read

Fleet Standardisation Doesn't Fail in Your CMMS. It Fails Before It.

Why fleet standardisation programmes underdeliver, and how a data staging layer closes the gap between platform consolidation and real operational consistency.

🔧 Data Quality
08
Mar 10, 202614 min read

Don't Move the Mess: A Data Engineer's Guide to Maximo MAS 9 Migration

Your Maximo migration will fail without clean data. Here's exactly what to fix - asset hierarchies, duplicates, field gaps - before you move to MAS 9.

📊 CMMS
09
Feb 13, 202616 min read

How to Implement SFI Coding in Your CMMS: A Practical Guide for Maritime Teams

The step-by-step process for building an SFI-based asset hierarchy in your CMMS, from licence acquisition to fleet-wide rollout.

📊 CMMS
10
Feb 6, 202617 min read

What is CMMS Data Staging? The Complete Guide for Maintenance Teams

Why the best CMMS implementations never load data straight into production. Learn what data staging is, when you need it, and how it prevents costly rework.

🔧 Data Quality
11
Feb 2, 20266 min read

The Hidden Liability Risk of Loading Data Directly into Maximo with MXLoader

MXLoader is unsupported by IBM and disclaims all liability. When it damages production data, who pays? Why consultants add a staging layer first.

📊 CMMS
12
Jan 19, 20267 min read

The Hidden Cost of Ignoring Criticality: Why Your CMMS Data is Failing You

Without criticality assessment, maintenance teams operate blind. Why 20% of equipment drives 80% of business risk, and how to prioritise it.

🔧 Data Quality
13
Jan 9, 20269 min read

Your Vendor Data Doesn't Match RDS-PS (And It's About to Become Your Problem)

RDS-PS and ISO 14224 solve different problems but work together. Why EPC vendor data never arrives RDS-compliant, and how to fix it before go-live.

📋 Standards
14
Dec 30, 20255 min read

Why Your Asset Register Has 47 Different Pump Types

You can't standardise maintenance on assets you can't find. Here's how naming chaos quietly kills your CMMS investment.

📊 CMMS
15
Dec 2, 20255 min read

The Vendor Upload That Shattered the CMMS Hierarchy

Why multi-vendor projects quietly create the biggest data risk in any CMMS implementation, and how to spot the corruption before it reaches production.

📊 CMMS
16
Nov 11, 20255 min read

The Excel Handover Every CMMS Project Dreads

Six months into implementation, your consultant sends you 47 tabs of asset data. You have two weeks to review it. Here's why this moment breaks most projects.

🔧 Data Quality
17
Nov 3, 202510 min read

Insure Your Maximo Application Suite Migration Against Known Data Failures

Data quality problems derail most CMMS upgrades. Here's how to catch them before they cost you 6 months and £200K in consultant time.

📋 Standards
18
Oct 23, 202513 min read

Your Preventive Maintenance Program Isn't ISO 14224 Compliant (And You Probably Don't Know It)

Most CMMS implementations violate ISO 14224 without anyone realizing it. Why identical assets get different PM schedules, and how to fix it systematically.

📋 Standards
19
Oct 7, 20253 min read

PM Optimization is Now Live

Standardise PM schedules across identical equipment in minutes. See inconsistencies side-by-side, fix with one click, export back to your CMMS.

📊 CMMS
20
Oct 4, 20255 min read

Why 70% of CMMS Implementations Fail (And How AssetStage Fixes It)

70% of CMMS implementations fail due to bad data, not bad software. How AssetStage's visual workspace solves the data quality crisis legacy methods can't.

📋 Standards
21
Oct 2, 20257 min read

MXLoader: 7 Common Problems and How to Fix Them

Failed imports, Excel formatting errors, duplicates, timeouts — the most common MXLoader problems in Maximo and the practical fixes that actually work.

📊 CMMS
22
Sep 8, 202511 min read

SFI Coding and ISO 14224: A Complete Guide for Maritime CMMS

How combining SFI equipment identification with ISO 14224 reliability standards creates a comprehensive framework for maritime maintenance management.

📊 CMMS
23
Sep 1, 202510 min read

Maritime CMMS: Why Shipping's $30 Billion Maintenance Problem Isn't Going Away

With 109,000+ vessels and maintenance eating 30% of operating costs, most shipping still runs on spreadsheets. Here's what maritime CMMS does differently.

📋 Standards
24
Aug 25, 20259 min read

RDS-PP to RDS-PS: Understanding the Evolution in Power System Classification

A detailed comparison of RDS-PP and RDS-PS reference designation systems, and how RDS-PS improves on its predecessor with broader applications.

📋 Standards
25
Aug 18, 20259 min read

Building Your Asset Hierarchy: A Step-by-Step Guide

Learn how to structure your asset hierarchy for maximum efficiency. Includes real-world examples from manufacturing, utilities, and facilities management.

📊 CMMS
26
Aug 11, 20256 min read

Why AI Won't Save Your CMMS (But Good Data Will)

Everyone's talking about AI in maintenance, but the real ROI comes from something simpler: clean, standardised data. Why quality beats algorithms.

⚙️ Software
27
Aug 4, 20257 min read

IBM Maximo vs SAP PM: Key Differences Explained

Maximo is object-oriented and maintenance-centric; SAP PM is process-driven and enterprise-integrated. How they differ on hierarchies, work orders and PMs.

📊 CMMS
28
Jul 28, 20256 min read

The Complete Guide to CMMS Data Migration

Everything you need to know about migrating from legacy systems to modern CMMS platforms. Includes templates, checklists, and common pitfalls to avoid.

Ready to Transform Your CMMS Data?

Stop struggling with bad data. Request a trial today.

Request a Trial →Book a Demo